Tuesday, April 26, 2011

Ensuite Tiling

Ensuite:
"Olive" porcelin tiles (which are grey!)
With a black, silver, and grey linea feature tile.

Vanity Cupboard is Formica White Silver with a Formica Silver Shadow Top.

Hopefully it will look better once it is all cleaned and painted white.





























Tiling Pics form the 19th April

Main Bathroom and Powder Room have off white porcelin tiles with a stone feature tile above the vanities and in the shower. Vanity Cupboard doors are Laminex Natural White with a Formica Mist Grey top.
It's all coming together - can't wait to see it painted (it's just the prep atm) and also with the mirrors, bath and shower screens in.








































Monday, April 11, 2011

Bits and Peices are done!

So last week this is what had been done:



  1. Painter painted the ceilings and the undercoat prep.

  2. Shelving in the pantry, WIL and laundry cupboards

  3. Doors on

  4. Kitchen in

  5. Vanities in

  6. Skirtings applied

  7. Exterior Painter finsished

  8. Water Tank Delivered

  9. Tiler started... I think he is due to finsish today..

So it's all coming together.


Oh and I also booked solar power panels to get in before the rebate reduces!! Woohooo!!!!

-

Monday, March 28, 2011

More gyprock photos

Main Bath


Kitchen.


Laundry on the left and WIP on the Right

Gyprock is in!

Rumpus Room





















Kitchen & Rumpus


(door is the laundry)



Front Living Room

Front Entrance, with entry bulkheads





Family Room.




We heightened the height of the nook bulkhead so we could put some shelves in later.






Monday, March 21, 2011

Inside kitchen area



Sorry Gav, this is the only updated inside one I have on this computer. This is looking at the kitchen. Kitchen is directly in front ( you can see where the island banch will be) pantry on the right and the laundry on the left. On the far left is the rumpus room.

Looking up at the main bedroom


More outside pics


bricks and roof finished







Okay so it has been an extremely long time betweeen posts!! Sorry.
Transfer of my full-time job + full-time uni + building a house = very limited time!!!

Anyway here are some updated pics.
The bricks need to be cleaned, the down pipes need to be painted.
But the electricak and air con rough in in done and the gyprock is ready on site.
The gyprocking starts tomorrow - I am excited.