Monday, March 28, 2011

More gyprock photos

Main Bath


Kitchen.


Laundry on the left and WIP on the Right

Gyprock is in!

Rumpus Room





















Kitchen & Rumpus


(door is the laundry)



Front Living Room

Front Entrance, with entry bulkheads





Family Room.




We heightened the height of the nook bulkhead so we could put some shelves in later.






Monday, March 21, 2011

Inside kitchen area



Sorry Gav, this is the only updated inside one I have on this computer. This is looking at the kitchen. Kitchen is directly in front ( you can see where the island banch will be) pantry on the right and the laundry on the left. On the far left is the rumpus room.

Looking up at the main bedroom


More outside pics


bricks and roof finished







Okay so it has been an extremely long time betweeen posts!! Sorry.
Transfer of my full-time job + full-time uni + building a house = very limited time!!!

Anyway here are some updated pics.
The bricks need to be cleaned, the down pipes need to be painted.
But the electricak and air con rough in in done and the gyprock is ready on site.
The gyprocking starts tomorrow - I am excited.

Monday, November 1, 2010

The slab has been poured




Well I know it may not seem so exciting to everyone else but I am pretty thrilled that our slab has finnally been laid. Our SS called us to ask our intentions with the drainage points in the workshop and I am glad that he did because for some reason 1 drainage point had been removed and 3 others had changed places in the final plans without us knowing. The points were in the right place when it was submitted to council and we hadn't asked them to be moved so we didn't really notice the change. We are very thankful that our SS looked at the plans thoroughly and took the initiative to call us to double check. So everything is in the right spot and the slab has been layed. Woohoo.... Below are the pics.